Specifying Cell Permit - JRC J-Marine NeCST Instruction Manual

Table of Contents

Advertisement

Specifying Cell Permit

Whether or not Cell Permit is required depends on ENC charts.
• In case of S-57 Chart, Cell Permit is not required.
• In case of S-63 Chart, Cell Permit is required.
The following subsections describe the details.
When S-57 Chart Is Specified
Following popup screen is displayed, tap [Close] button.
The screen switches to the specifying the SA Certificate File screen.
When S-63 Chart Is Specified
3-112

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents