® RL / RM / RMF, RLT Joining Instructions RLN / RMN / RLNI / RLNIE Joining Instructions Splashguard brackets must be installed before piping or PARTS LIST wiring case. Æ Item Quantity Description RL/RM RLNI RM/RMF RLNIE Donut Gasket Gasket, 1 x 1 /2 x 180 in.
Page 2
Alignment Pin G. RLNI Only: Remove screws and inte- rior top panel on both sides of the island case end to be joined (see Figure 1). RLNI Only HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 3
Figure 2. Remove Shipping Block (One From Each Side of Island Models) o not use shipping bolts to join cases Shipping Brace RLNI / RLNI Figure 3. Remove Shipping Braces HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 4
Alignment Pins are in place in the right end frame as shown in Figure 4A or 4B. RL / RM / RMF RLN / RMN Alignment Pin Figure 4A. Verify Nut Retainer Installation HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 6
Use all three gaskets When applying an end assembly. Right End Left End Right End Case Left End Case Figure 5A, Part 1. Apply Gasket to Left End of Pad Shoe Sealer RL/RM/RMF and RLN/RMN HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 7
ALL MODELS: Apply gasket between wipes. Pad Shoe Sea Pad Shoe Sealer Overlap Gasket Figure 5A, Part 2. Apply Gaskets to Right End of RL/RM/RMF and RLN/RMN HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 8
P/N 0387177_K Reach-in Joining Instructions RLNI Left End Case Pad Shoe Sealer Figure 5A. Apply Gaskets to Left End of RLNI HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 9
P/N 0387177_K RLNI Right End Case 1 i n. x i n. i n. x i n. Pad Shoe Sealer Figure 5B. Apply Gaskets to Right End of RLNI HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 10
Left End Case Figure 5C, Part 1. Apply Gasket to Left End of RLT 1- Donut 2- 1 in x in x Use all three gaskets When applying an end assembly Pad Shoe Sealer HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 11
P/N 0387177_K Move the second merchandiser RL / RM / RLN / RMN / The RLT has no alignment against first, mating alignment Left End RLNI: Do not to cut wires pin and the wireway is at the pins with corresponding holes.
Page 12
P/N 0387177_K Reach-in Joining Instructions R L or R M R LN or R MN R LNI Do not cut wires in bumper retainer. Figure 6. Move Cases Together HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 13
D. Go to the middle back wall position and join. E. Join at the lower back wall. F. Finally, join at the top back wall posi- Figure 7A. Joining Sequence for RL, RM, RMF, tion. RLN and RMN Cases Following the same sequence, tighten each cap screw fully until the merchandisers are joined with a snug fit and gaskets are compressed.
Page 15
Splice Connector – 8. shown in Figure 9. Note that RLT cases have steel splashguards that do not use a splice connector. Spl i ce C onnect or Splice Connector Figure 9. Installing Splashguard Splice Connector HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Page 16
2. I nstall splashguard support brackets . The leveling brackets have a before pIpIng case maximum extension of one (1) inch (25 mm) for uneven floors. DO NOT place shIms under splashguard brackets HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.