Mounting Kits PR 6002
2.3
Internal Lift-off Protection
All mounting kits are equipped with an internal lift-off protection; i.e. no bore holes other than the
mounting holes for the kit are required.
The Lift-off protection is realized by a bolt (2), nut (1) and a retainer (3). Bolt and nut are delivered in a
bag.
•
Mount the lift-off protection after installation/alignment of the load cell.
•
Do not turn the slots by more than 30° from the vertical.
2.4
Rubber Ring for Mounting
1...10 t
The rubber ring for mounting is used for vertical installation of the load cell.
•
Place the rubber ring on the lower load disk.
•
Position the load cell between the load disks.
•
Lower the vessel and tighten the mounting screws.
•
Pull out the four tabs on the rubber ring by approx. 15 mm so that the rubber ring is removed from
between load disk and load cell.
•
Then tear or cut off the rubber ring to remove it completely.
EN-4
3
25...50 t
Installation Manual
1
2
Sartorius