Mounting; Pr 6002/02S, ../03S - Sartorius PR 6202 Series Installation Manual

Mounting kits for load cell
Table of Contents

Advertisement

Available languages

Available languages

Installation Manual
4.3

Mounting

4.3.1

PR 6002/02S, ../03S

Note:
The following steps must be performed at all supporting points of the weighing
object (e.g. vessel)!
Put the mounting kit on the foundation (7) and tighten the bolts (5) lightly.
Place the weighing object (1) on the mounting kit and adjust the mounting kit position over the
bore holes.
Adjust the position of the washers over the bore holes so that the bore holes are covered.
Tighten the bolts (3) of the upper mounting plate (2) and the bolts (5) of the lower mounting
plate (6) with the recommended tightening moment, see Chapter 4.2.
Lift the weighing object (1) approx. 5 mm, a required lifting tool.
Clean the load cell base in both load disks.
Protect the contact surfaces between load cell/load disks with sufficient
Position and install the load cell (4) using the rubber ring for mounting, see Chapter 2.4.
Put the weighing object (1) again on the mounting kit, using a required lifting tool.
Remove the rubber ring, see Chapter 2.4.
Sartorius
Mounting Kits PR 6002
grease.
EN-19

Advertisement

Table of Contents
loading

Table of Contents