Check After Installation And Start-Up; Spare Parts And Accessories - Sartorius PR 6202 Series Installation Manual

Mounting kits for load cell
Table of Contents

Advertisement

Available languages

Available languages

Mounting Kits PR 6002
5

Check after Installation and Start-Up

After the installation of all mounting kits and load cells, the correct mounting must be checked. In
particular, force shunts must be avoided.
After mounting also, check
whether the load cell is inserted without tilt in the mounting kit.
whether the upper and lower mounting plate is positioned horizontally.
whether there are vertical space for movement and the required space for thermal expansion.
whether there are clearance of the constrainer.
The space for movement required for displacement of the object to be weighed due to thermal
expansion, vibration, etc. can be used only if load cell is installed exactly.
To prevent vertical force shunts, all mechanical connections (pipes, cables and bellows) of the object to
be weighed to its surrounding construction must be as flexible as possible. The overall load must be
supported by the load cells.
6

Spare Parts and Accessories

Pos. Description
1
Lift-off protection (stainless steel)
2
Rubber ring for mounting
3
Rubber ring for mounting
EN-22
Max. capacity
1...10 t
25...50 t
Installation Manual
Order number
5312 502 18011
5312 693 98117
5312 693 98118
Sartorius