Download Print this page

LDPI LEHL2 Series Installation, Operation And Maintenance Instructions page 6

Led hazardous location lighting fixtures

Advertisement

INSTALLATION INSTRUCTIONS
Installation: Mechanical Connection (Continued)
3. Pendant
Socket head cap Screws M5
Step 1:
Thread the pendant hood onto the 3/4" NPT conduit. Tighten the M5 set-screw against the conduit to prevent loosening.
Step 2:
Hang the fixture onto the hinged hook of the driver housing cover. Connect supply wires to luminaire wire leads (or Wago
connectors provided).
Step 3:
Close driver housing, making sure that all wires are safely tucked inside housing. Tighten (3) M6 captive closing screws to
6 N-m. Ensure NPT fittings are water tight to prevent water leakage.
4. Stanchion 90° / Stanchion 25°
Socket head cap Screws M5
Step 1:
Securely thread the adapter onto the appropriate NPT size conduit. Determine the proper fixture orientation and tighten the
M5 set screw. Ensure the adapter gasket is properly seated in the groove.
Step 2:
Hang the fixture onto the adapter. Align as marked on the housing.
Step 3:
Rotate the fixture clockwise and secure the adapter with (5) M5 screws (provided) and torque to 5 N-m.
Step 4:
Unscrew the hood and connect supply wires to luminaire wire leads (or Wago connectors).
Step 5:
Close driver housing ensuring all wiring are inside the driver housing. Tighten (3) M6 captive screws to 6 N-m. Ensure NPT
fittings are water tight to prevent water leakage.
LDPI, Inc. | (800)-854-0021 | www.ldpi-inc.com | sales@ldpi-inc.com
3/4'' NPT
Step 1
Step 1
Socket head cap Screws M5
Step 3
Step 2
Step 4
Step 3
Mark
Mark
Step 2
Step 5
LEHL2
Page 5
v.06.18.20

Advertisement

loading

This manual is also suitable for:

Lehl2-l1-v1Lehl2-l2-v1Lehl2-l3-v1Lehl2-l4-v1Lehl2-l1-v2Lehl2-l2-v2 ... Show all