Download Print this page

LDPI LEHL2 Series Installation, Operation And Maintenance Instructions page 4

Led hazardous location lighting fixtures

Advertisement

INSTALLATION INSTRUCTIONS
Installation: Mechanical Connection (Continued)
5. Wall - 90°
Step 1:
Mark and drill desired location on mounting surface. Secure the junction box (provided) with (4) M8 expansion bolts (not
provided) directly to a structural member. Thread onto 3/4" NPT conduit.
Step 2:
Pull field wiring through into the wall mount adapter. Secure the adapter with (6) M4 screws (provided) directly to the junction
box. Ensure adapter gaskets is properly seated in the groove.
Step 3:
Hang the entire fixture onto the adapter. Align as marked on the housing.
Step 4:
Rotate the fixture clockwise and secure to the adapter with (5) M5 screws (provided) and torque to 5 N-m.
Step 5:
Unscrew the driver cover housing hood and connect supply wires to luminaire wire leads (or Wago connectors).
Step 6:
Close driver housing ensuring all wiring are inside the driver housing. Tighten (3) M6 captive screws to 6 N-m. Ensure NPT
fittings are water tight to prevent water leakage.
LDPI, Inc. | (800)-854-0021 | www.ldpi-inc.com | sales@ldpi-inc.com
Expansion bolts
(Washers required) M8
3/4'' NPT
Step 1
Mark
Mark
Top view
Step 3
Step 5
Socket head cap screws M4
Step 2
Socket head cap screws M5
Step 4
Step 6
LEHL2
Top view
Page 6
v.06.18.20

Advertisement

loading

This manual is also suitable for:

Lehl2-l1-v1Lehl2-l2-v1Lehl2-l3-v1Lehl2-l4-v1Lehl2-l1-v2Lehl2-l2-v2 ... Show all