Download Print this page

LDPI LEVP-14W LED Series Installation Instructions

Advertisement

Quick Links

LEVP-14W LED Series
Read instructions carefully before attempting to install fixture. Save these instructions.
WARNING:
Disconnect power during installation and before servicing.
SAFETY:
This fixture must be wired in accordance with the National Electric Code, and
applicable local codes and ordinances.
Proper grounding is required to insure personal safety.
A qualified electrician should perform all wiring.
Junction Box install method
Remove the Junction Box side cover screw.(Remove only one screw of the Junction Box), depends which way
the wire comes into the junction Box, install the UL listed conduit(1/2 trade size) and UL listed conduit
fitting(waterproof) to the junction Box, also the Junction Box just for one light fixture
Ceiling Mounting:
"version A"
1. Attach the cast junction box to surface with screws (hardware by others).
2. Run conduit to junction box if application calls for it and pull supply leads into junction box with at least 6" lead showing.
Note: Be sure to use Teflon tape to seal 1/2" NPT threads for Wet Location Environments!
3. Place gasket (from polybag) and make wiring connections from driver in LED Heatsink to supply leads as indicated
below on "Wiring Connections"
4. Remove PC Lens
(Glass & Guard),
screws provided in polybag. Insert the screws through the holes on the inside of LED Heatsink. Next align the screws with
the holes on the "Adaptor Plate" mounted on the "Junction Box"and tighten.
5. Replace PC Lens
(Glass & Guard),
Wall Mounting:
"version B"
1.
Attach the cast junction box to surface with screws (hardware by others).
2. Run conduit to junction box if application calls for it and pull supply leads into junction box with at least 6" lead showing.
Note: Be sure to use Teflon tape to seal 1/2" NPT threads for Wet Location Environments!
3. Connect the wires from the"Quick Disconnect"wiring harness provided in polybag, to the supply side wires from the
junction box as indicated below on "Wiring Connections".
4. Next mount the "Wall Bracket", first place gasket between J - box and Wall Bracket then insert the "Quick Disconnect
wiring harness through the inside of Wall Bracket, now attach Wall Bracket to junction box using the four (4) 3/4" long
screws provided in polybag and tighten securely.
5. Next, using gasket provided in polybag, thread wiring through the gasket opening. Take the LED Heatsink and snap
together the two (2) "Quick Disconnects" one leading from the driver and the other coming out from the Wall Bracket.
(Glass & Guard),
6. Remove PC Lens
Insert the screws through the holes on the inside of LED Heatsink. Next align the screws with the holes on the Wall
Bracket and tighten securely.
7. Replace PC Lens
(Glass & Guard),
Form #D-1281 LDPI, Inc. 1-800-854-0021
INSTALLATION INSTRUCTIONS
.
with the gasket in place, attach LED Heatsink to junction box by using the two (2)
onto fixture by threading until tight (care must be given to not cross thread).
attach LED Heatsink to Wall Bracket using the two (2) screws provided in polybag.
onto fixture by threading until tight (care must be given to not cross thread).
Web:http://www.ldpi-inc.com Email: sales@ldpi-inc.com
Page1

Advertisement

loading

Summary of Contents for LDPI LEVP-14W LED Series

  • Page 1 Insert the screws through the holes on the inside of LED Heatsink. Next align the screws with the holes on the Wall Bracket and tighten securely. 7. Replace PC Lens onto fixture by threading until tight (care must be given to not cross thread). (Glass & Guard), Form #D-1281 LDPI, Inc. 1-800-854-0021 Web:http://www.ldpi-inc.com Email: sales@ldpi-inc.com Page1...
  • Page 2 Connect the black fixture wire to the black supply wire (line). Connect the white fixture wire to the white supply wire (neutral). Connect the green fixture wire to the junction box ground wire. Form #D-1281 LDPI, Inc. 1-800-854-0021 Web:http://www.ldpi-inc.com Email: sales@ldpi-inc.com Page2...