4 INSTALLATION

4.1

Taking over

When taking over a delivered product, visual inspection shall be carried out to confirm the integrity of
both the product and its packaging.
The correct scope of delivery shall be checked in reference to the product order, delivery note and
product rating plates.
4.2

Meter handling

Avoid lifting the meter by holding onto any transmitter part or connection box; use for this purpose the
meter flanges or lifting eyes only.
In transport, to avoid irreversible damage to the meter lining, do not place any auxiliary
component parts into the meter piping.
Forbidden gripping
When using lifting equipment, apply suitable textile slings; application of metal chains or cables might
result in damage to the meter.
It is recommended to transport the meter to the installation site in transport packaging.
4.3

Storage

For a flowmeter in storage, it is essential to:
• Observe the specified storage conditions regarding temperature and humidity;
• Avoid long-term meter exposure to direct sunshine (risk of damage to the meter display).
It is recommended to store the meter in complete transport packaging and remove the
covers and packaging materials only immediately before installation.
ELIS PLZEŇ a. s., Luční 425/15, 301 00 Plzeň, Czech Republic, phone.: +420 377 517 711, fax: +420 377 517 722 Es 90678K
Project design, installation and service manual
Electromagnetic flowmeter FLONET FH30xx
Page 18 of 72
Recommended gripping