Page 1
RG-EG2100-P V2 Hardware Installation and Reference Guide...
Page 2
This document is provided “as is”. The contents of this document are subject to change without any notice. Please obtain the latest information through the Ruijie Networks website. Ruijie Networks endeavors to ensure content accuracy and will not shoulder any responsibility for losses and damages caused due to content omissions, inaccuracies or errors.
It is intended for the users who have some experience in installing and maintaining network hardware. At the same time, it is assumed that the users are already familiar with the related terms and concepts. Obtaining Technical Assistance Ruijie Networks Website: https://www.ruijienetworks.com/ Technical Support Website: https://ruijienetworks.com/support...
Featured with global-leading semiconductor technologies and communication control technologies, Ruijie EG series breakout gateway is a data communication product developed by Ruijie Networks with independent intellectual property right. The EG series breakout gateway is designed according to international standards, similar to the mainstream breakout gateway products in the international market.
Please avoid the vibration and collision in the process of moving and usage. Products should be transported in original package. Appearance Figure 0-1 Front Panel of RG-EG2100-P V2 Breakout Gateway Figure 0-2 Back Panel of RG-EG2100-PV2 LED Indicator LED Indicator Working Status Blinking green: The device is being initialized.
Invite professionals and related technicians to install this type of device. Installation Environment Ruijie EG series breakout gateway products are for indoor use only. To ensure normal operation and prolong their service life, the installation site must meet the following requirements:...
RG-EG2100-P V2 Hardware Installation and Reference Guide Preparation Temperature/humidity requirements To ensure normal operation and prolong the service life of the device, the equipment room must maintain constant temperature and humidity. If the equipment room is overheated for a long time, the insulation materials may result in defective insulation and even electric leakage.
RG-EG2100-P V2 Hardware Installation and Reference Guide Preparation 0.01 The breakout gateway has already given consideration to electrostatic prevention during circuit design, but excessively strong static electricity will still damage the circuit board. The static electricity in the communication network connected with the device is mainly from: ...
The installation position of breakout gateway is generally a cabinet or a workbench. Mounting into a Cabinet Ruijie breakout gateway products are designed based on the dimension of a standard cabinet. You can install the device with the enclosed fixing accessories. Mounting on a Workbench In most cases, the user does not have a standard cabinet.
RG-EG2100-P V2 Hardware Installation and Reference Guide Installing Breakout Gateway less than 1 ohm. The EG series devices are equipped with a grounding pole at the rear panel, as shown in Figure 3-2. Figure 3-2 EMC Grounding Checking after the Installation...
RG-EG2100-P V2 Hardware Installation and Reference Guide Troubleshooting Troubleshooting Power Supply Refer to Product Overview for the normal state descriptions of LED indicators. If abnormity occurs, perform the following checks: Whether the power switch is turned on. Whether the power supply of the breakout gateway is turned on.
Need help?
Do you have a question about the RG-EG2100-P V2 and is the answer not in the manual?
Questions and answers