Proof Test Procedure For Kfd2-Ut2-(Ex)*(-1) - Pepperl+Fuchs KFD2-UT2 Series Manual

Functional safety temperature converter
Hide thumbs Also See for KFD2-UT2 Series:
Table of Contents

Advertisement

Functional Safety KFD2-UT2-(Ex)*(-1)
Operation
5.2

Proof Test Procedure for KFD2-UT2-(Ex)*(-1)

Perform the proof test with the same configuration that you use in the application.
Substitute the sensor with a sensor simulator or a calibrator.
Check the safety function at the input, which must be configured to set the output values
to 4 mA, 12 mA, 20 mA.
Equipment required:
Digital multimeter with an accuracy of 0.1 %
Use for the proof test of the intrinsic safety side of the device a special digital multimeter
for intrinsically safe circuits.
If intrinsically safe circuits are operated with non-intrinsically safe circuits,
they must no longer be used as intrinsically safe circuits.
TC simulator, RTD simulator, voltage source or resistor
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents