Mounting Of The Operator - Bauer Jupiter 250 Mounting Instructions

Swing gate operator
Table of Contents

Advertisement

Available languages

Available languages

16. Mounting of the operator

Note: The mounting of the operator is absolutely easy. Nevertheless you should
carefully read the mounting instructions before starting the mounting. This prevents
you from making any mistake and allows you to save time and to avoid trouble. The
manufacturer cannot assume any liability for any damage of the operator which re-
sults from an incorrect mounting.
In order to make sure that the operator works without any difficulty a smooth-
running gate without stabilizers is required. The hinges should be free of clearance.
This operator is not appropriate for gates exposed to a heavy wind load.
Signalling lines may not exceed the length of 30 m. As soon as the length of the ca-
ble exceeds 5 m you have to use a shielded cable.
Now fix the sheathing of the gate wing to the closed gate in such a way that the di-
mension C (see page 16, point 15 " dimensions/mounting dimensions" ) is not ne-
glected. In order to do so turn the driving rod as long as the dimension C is reached.
Check the horizontal alignment of the operator.
Measure the dimension A and B (see page 16) according to the
pile and fix the sheathing of the pile to the pile itself.
(The sheathings can be welded or screwed. If the sheathing is
screwed, you have to choose anchor bolts which do not loosen
when the operator is active. The best solutions are adhesive
shear connectors).
The distance from the floor to the bottom edge of the sheathing
of the pile has to amount to at least 100 mm.
17

Advertisement

Table of Contents
loading

Table of Contents