Levelling - KERN ADB Series Operating Instructions Manual

Analytical balance
Table of Contents

Advertisement

Prior to any installation and assembly works, the balance must
be separated from the mains supply.
 Remove the transport securing from the lower side of the balance.
 Install the balance at the intended workplace.
The right place is decisive for the accuracy of the weighing results of high-
resolution analytic balances (see chap. 6.1).
 Put the following parts upon in the right order
Round bottom sheet
Air chamber
Carrier of weighing plate
Weighing pan
 Connect the display unit with the balance.
As the terminal is not rigidly assembled to the balance, it can be freely placed in
the vicinity of the balance but not further away than this is permitted by the
length of the cable.

6.3 Levelling

 Level balance with foot screws until the air bubble of the water balance is in the
prescribed circle.
Check levelling regularly.
14
ADB-BA-e-1510

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adb 200-4

Table of Contents