Installation and Operating Specification EDR
3.3 Disposal / recycling
Disposal must be carried out professionally and in an environmentally friendly way in
accordance with the respective national legal stipulations.
Separate the materials by type and in an environmentally friendly way.
"
If necessary, commission a specialist company with the waste disposal.
"
4 Mounting
Before installation remove the device from the packing and check for any possible
•
shipping damage!
Assemble the device on a clean and stable base. Do not distort during assembly! Use
•
the appropriate mounting devices for proper installation of the unit!
Use the templates printed on the device packing to mark the fastening bore holes.
•
The pressure measuring depends on position, therefore the mounting must be made
•
vertical and as possible on a vibration-free place (cable inlet and pressure connec-
tions down).
The pressure line´s connection should be with plastic-hose (in building), inside diam-
•
eter 4 / 5 mm. For a firm hold of the hose, its inside diameter must be 1 mm smaller
than the outside diameter of the hose nozzle (step spigot 5 / 6 mm).
Remove the connection cover for mounting and electrical connection. Close the lid
•
again carefully before start-up (tightening torque of the lid screws 1.1 Nm).
Vertical mounting
L-BAL-E292-GB 1841 Index 001
Schraube
max
screw max
4,5 mm
Drilling template on packing
Part.-No.
5/15
Bohrschablone
drilling template
4,5 mm
91 mm
Gehäuse / housing
106 mm
Mounting