Appendix B • Vission 20/20 Application Procedures
VISSION 20/20 SOFTWARE SETUP
Step 1: Configuration Screen Selection of
Installed Boards
Logon and navigate to the Configuration screen, page
number 6. Insure that all boards that are physically
Figure B-32. Selection of Installed Boards (Configuration Screen – Page 6)
Vission 20/20 • Operation and Service Manual • Emerson • 35391SC 2.7
installed into the 20/20 panel have been selected or
"checked". You should have the additional board #10
installed (analog output board) and selected.
Continue to step 2.