INSTALLATION
Sites where Thermoelectric Generators are placed vary greatly and are unique. Instructions
for preparing the installation here are for a single model S-8500 TEG. Please contact your
Global Power Technologies (GPT) representative for more information on custom solutions.
Tools Required
See Appendix E Service and Installation Tools.

2.1 SITE PREPARATION

The site should be prepared in advance of the arrival of the TEG. The Model S-8500 is
designed for General Area use and Outdoor Applications. No shelter is required for operation
of this TEG.
Mount the TEG to a level and sturdy stable base capable of supporting the 273 kg (603
lb) mass of the TEG. Bolt down the TEG using 1/2-13 bolts of material suitable for the
environment. See Appendix B Overall Weight & Dimensions for mounting hole locations.
WARNING: Maintain a minimum clearance horizontally of 46 cm
(18 inches) from the TEG on all four sides to combustible walls. DO
NOT use
using non-combustible roofing and its required clearances.

2.2 UNPACKING

Unpack the TEG from its shipping crate, keep the crate until the TEG is operational. Locate
and identify the following items that were shipped with the S-8500 TEG main assembly,
and any options kit assemblies that would have been shipped with the order, in particular
Cathodic Protection or DC/DC converter panels.
1
Rain cap
1
Stand kit (See Appendix F, Figure 20 for details)
1
Ball Valve and nipple
2
Spare 3 A fuses
Thread sealant
WARNING: Inspect the TEG for damage which may have occurred
during shipping. Report any damage as soon as possible. Some
damage
before operating a damaged TEG.
Global Power Technologies
S-8500
a combustible roof above the TEG. Consult with GPT for
may make the generator inoperable. Consult with GPT