Download Print this page

EVAPCO LPT Series Rigging And Installation Manual page 5

Forced draft cooling towers; forced draft closed circuit coolers; forced draft evaporative condensers

Advertisement

The sealer tape should overlap on the corners as shown in Figure 4. Do not splice the sealer tape along the end flanges and
preferably not on the side flanges if it can be avoided. Always remove the paper backing from the sealer tape.
Rigging and Assembling Discharge and Intake Accessories
Intake sound attenuators and discharge hoods/discharge attenuators are not assembled to the main unit when shipped and must
be separately rigged and assembled in the field. Four accessories fall into this group - discharge hood (may be straight or tapered),
discharge attenuation, fan-end sound attenuator and fan side attenuators. These are shown mounted in Figure 5 and construction
details are referenced to Figures 7, 9 and 11 respectively.
Low Profile Forced Draft Towers, Coolers and Condensers
2 OVERLAPPING
LAYERS OF SEALER
ON THE ENDS
END
Figure 4 – Proper Sealer Tape Application
Hood or attenuation only
FIG. 7
Figure 5 – Discharge and Intake Accessory Rigging
1 LAYER OF SEALER
CENTERED OVER THE
MOUNTING HOLES
SIDE
FIG. 11
FIG. 9
5

Advertisement

loading

This manual is also suitable for:

Lrw seriesLrc series