termovana DESYRE 9.0 General Information - Warnings - Installation - Maintenance page 3

Air pellet cooker
Table of Contents

Advertisement

INDEX
1
GENERAL INTRODUCTION
1.1
SYMBOLS
1.2
DESTINATION OF USE
1.3
SCOPE AND CONTENTS OF MANUAL
1.4
STORAGE OF MANUAL
1.5
UPDATE OF THIS MANUAL
1.6
GENERAL INFORMATION
1.7
MAIN STANDARDS APPLIED AND TO BE APPLIED
1.8
LEGAL WARRANTY
1.9
MANUFACTURER'S LIABILITY
1.10 CHARACTERISTICS OF THE USER
1.11 TECHNICAL ASSISTANCE
1.12 SPARE PARTS
1.13 IDENTIFICATION PLATE
1.14 STOVE DELIVERY
2
SAFETY WARNINGS
2.1
WARNINGS FOR THE INSTALLER
2.2
WARNINGS FOR THE MAINTENANCE TECHNICIAN
2.3
WARNINGS FOR THE USER
3
CHARACTERISTICS OF FUEL
3.1
CHARACTERISTICS OF FUEL
3.2
STORAGE OF PELLETS
4
HANDLING AND TRANSPORT
4.1
REMOVAL FROM TRANSPORT PALLET
5
INSTALLATION
5.1
GENERAL CONSIDERATIONS
5.2
SAFETY PRECAUTIONS
5.3
PLACE OF INSTALLATION OF STOVE
5.4
COMBUSTION AIR
5.5
FLUE GAS EXHAUST PIPE
5.6
STOVE LEVELLING
5.7
CONNECTION TO UTILITIES
5.8
OPTIMISATION OF COMBUSTION
5.9
VENTILATION
6
MAINTENANCE
6.1
MAINTENANCE
7
DEMOLITION AND DISPOSAL
8
INITIAL DISPLAY CONFIGURATION
8.1
CONNECTION TO AN EXTERNAL THERMOSTAT
9
CONTROL PANEL
9.1
USE OF CONTROL PANEL
9.2
PROGRAMMING
9.3
DATE AND TIME
9.4
WEEKLY
9.5
PROGRAMME NUMBER
9.6
DAY OF THE WEEK
9.7
HOUR
9.8
MINUTES
9.9
TEMPERATURE
9.10 REQUESTED PROGRAMME
9.11 PROGRAMME TYPE
> 4-6
9.12 PROGRAMME ENABLING
9.13 EXAMPLE OF PROGRAMMING
9.14 THERMOSTAT MODE
9.15 INTERNAL THERMOSTAT
9.16 OPERATING PARAMETERS
9.17 PELLET LOADING
9.18 FLUE GAS EXTRACTION
9.19 ROOM FAN
9.20 RECENT ERRORS LOG.
9.21 LANGUAGE SELECTION
10
DIAGNOSTIC ERRORS
10.1 ERROR 1 FAILED IGNITION
10.2 ERROR 2 FLUE GAS EXTRACTION MOTOR FAULT
10.3 ERROR 3 FLUE GAS EXTRACTION CIRCUIT FAULT
10.4 ERROR 4 NOT ACTIVE
> 7-8
10.5 ERROR 5 NO PELLETS
10.6 ERROR 6 PRESSURE SWITCH / THERMOSTAT ALARM
10.7 ERROR 7 NOT ACTIVE
10.8 ERROR 8 NO MAINS POWER
10.9 ERROR 9 FLUE GAS MOTOR ALARM
10.10 ERROR 10 OVERTEMPERATURE ALARM
> 9
10.11 ERROR 11 EXPIRY PASSED
10.12 ERROR 12 FLUE GAS PROBE
REMOTE CONTROL (OPTIONAL)
> 9
11
PRELIMINARY OPERATIONS
11.1 PELLET LOADING
11.2 ELECTRICAL POWER SUPPLY
11.3 POWER ON
> 10-14
11.4 POWER OFF
11.5 OPERATION WITH AMBIENT PROBE ON STOVE
TROUBLESHOOTING
12
CLEANING
13
HOT AIR DUCTING
14
COOKING METHODS
> 15
ID PLATE KEY
> 16
WIRING DIAGRAM
DESCRIPTION
> 17
TECHNICAL SPECIFICATIONS
> 17-19
REMOVAL FROM PALLET
MINIMUM DISTANCE FROM COMBUSTIBLE MATERIALS > 34
DIMENSIONS
09/2020 - EN
> 20
> 21
> 22-23
> 24-27
> 28
> 29
> 30
> 31
> 32
> 30-33
> 34
> 35
3

Advertisement

Table of Contents
loading

Table of Contents