3. Equipment Deployment and Implementation Solution

3.1 Deployment Point Selection

Try to set it up at the highest point, choose a wide field of vision, and deploy it at a location without high buildings nearby;
Keep away from high-power radio transmitting sources (such as TV stations, radio stations, microwave stations, etc.), and
the distance should not be less than 200m;
Keep away from high-voltage power lines and microwave radio signal transmission channels, and the distance should be
greater than 50m as far as possible;
The ground foundation is stable, which facilitates long-term installation of facilities;
The point selection is based on the basic requirements of the point selection, and is selected on the main bearing pillar of
the building. For other buildings that cannot be determined or the main bearing pillar can be selected on the main bearing
beam;
The device has the characteristics of transmitting GPS and GLONASS satellite navigation deceptive interference signals,
and has the ability to interfere with normal navigation users and important national infrastructure navigation equipment
(GPS, GLONASS).

3.2 Infrastructure Structure Design

The infrastructure uses a concrete base structure.
Concrete pier is constructed by on-site casting method of reinforced concrete. The amount of cement, sand, stones and
other additives in the concrete casting process and the requirements for concrete construction are implemented in
accordance with the requirements.
The reinforced skeleton in the concrete pier uses threaded steel bars with a diameter of ≧ 10mm. When using it, it must
be bent inwardly at a distance of 10cm from both ends (curved into a curved shape at the lower end of the foot tendon at
30cm). Wrapping tendons use ordinary steel bars with a diameter ≧ 6mm.
Pour the concrete to half the depth of the foundation when the foundation is constructed. After fully tamping, put the
bundled reinforced skeleton of the foundation, and place the bundled columnar reinforced skeleton vertically in the center
of the foundation. The frameworks are bundled together, and the concrete is poured to the top surface of the foundation,
which is fully tamped and the concrete top surface is level.
After the foundation concrete is hardened and solidified (about 12h at room temperature), observe the pier stone model
slabs vertically in the center of the foundation, pour concrete and fully tamp it. 0.2m below the ground, east and south of
the foundation Place a stainless steel lower level sign on each of the four sides of the west, north and west. When the
concrete is poured 0.10m below the top surface of the column model board, a compulsory centering sign will be placed.
The 12' circular level bubble indicates the adjustment sign. After the sign is completely level, concrete is poured to the top
surface of the pillar model slab and fully tamped. After the concrete has set initially (about 1h at room temperature), smooth
the top surface of the concrete. At this time, adjust the sign again with circular level bubbles until the sign surface is
completely level. The concrete surface of the central part of the adjusting marker stone shall be as flat as the surface of the
fixing nut used as the protective cover of the mark. The work of adjusting the sign to make the sign surface completely