The deployment and use of ADS2100C device does not require the configuration of radar detection equipment. It has the all-weather, all-day, all-round drone active defense capability, and drone cluster defense drive-off capability.
Tel: 886.909 602 109 Email: sales@salukitec.com www.salukitec.com Main machine Generate defense signals Power cord Powering the device Screw For product installation and fixing 2. Installation Instructions 2.1 Interface Introduction The external interfaces of this product are all on the bottom of the host, as shown in the Figure 2.1. Figure 2.1 Interfaces RJ45, debugging interface Power socket...
2.3 Commissioning and Testing Scheme The ADS2100C device has the characteristics of transmitting GPS and GLONASS satellite navigation deception jamming signals. After confirming that the equipment is working properly and broadcasting the signal, you can use the mobile phone map (or other navigation signal detection software) to check whether the navigation signals are affected by the deception jamming signals and the positioning is biased Shift situation.
Tel: 886.909 602 109 Email: sales@salukitec.com www.salukitec.com Figure 2.4 Software screenshot of signal turn off When the signal is on, Ublox-M8T deception positioning diagram is as below. Figure 2.5 Ublox-M8T deception positioning diagram After the signal is turned on, the number of GPS / GLO positioning stars is significantly increased. After the signal is turned on, the GPS / GLO is affected by the deceptive signal, and the positioning point follows the device to deceive the signal to move.
Tel: 886.909 602 109 Email: sales@salukitec.com www.salukitec.com during this period. If the problem cannot be solved after taking the above measures, please contact us for after-sales service. 3. Equipment Deployment and Implementation Solution 3.1 Deployment Point Selection Try to set it up at the highest point, choose a wide field of vision, and deploy it at a location without high buildings nearby; ...
Tel: 886.909 602 109 Email: sales@salukitec.com www.salukitec.com level should be until the sign is completely solidified (about 12h at room temperature). When the concrete is poured to 0.2 meters below the ground, the outer wall of the observation pier should be embedded ...