Center EHE0200364 Installation Manual

Center EHE0200364 Installation Manual

Rf thermostat
Hide thumbs Also See for EHE0200364:

Advertisement

Quick Links

Parameter
Description
Ot
Minimum boiler on/off time
Cr
Boiler cycles per hour
Proportional Band Width
Pb
tO
Temperature Offset
uL
Maximum set temperature limit
LL
Minimum set temperature limit
Heating/ Cooling changeover enable
HC
OS
Frost Protection temperature
LC
Loss of Communications instruction
FS
RESET to factory defaults
Binding or Re-Binding Procedure
Only Bind or Re-Bind if the units become
separated or one of them needs replaced.
No need to re-connect after power cuts or
battery replacement.
1.
Put the Relay Box into Binding Mode
a. Press and hold the Relay Box button for
15 seconds to cancel any prior Binding
information
b. After releasing the button, hold it down
again for 5 seconds until the red light flashes
evenly
2.
Put the Room Unit into Binding Mode
a. Press and hold the
button for 2 seconds,
then hold the  and
buttons together until
the screen displays Inst
b. Press the
button so the screen displays
COnt
c. Press the  button repeatedly until the
screen displays CLr. Then press
to clear
any previous binding to other devices
d. Press the  button again to return to Binding
Mode, where the screen displays COnt
3.
Press the
button to send the Binding signal
to the Relay Box. If successful, the red light on
the Relay Box will stop flashing and turn off.
In a few seconds the Room Unit will return to
normal operation, in Standby mode
For further information telephone 0344 292 7062
Whilst every care has been taken to ensure that the information included in
this document was accurate at the time of printing, we reserve the right to
change specifications at any time.
The photographs reproduced in this publication are within the constraints of
the printing process and are NOT to be used for matching purposes. E&OE.
Wolseley UK, The Wolseley Center, Harrison Way, Spa Park,
Royal Leamington Spa, CV31 3HH
Ref: 4277
Default Value
Setting options
1 minute
1 to 5 minutes
6 cycles per hour
3, 6, 9, 12 cycles
1.5°C
1.5 to 3.0°C
0 = no offset
+3 to -3°C
35°C
21 to 35°C
5°C
5 to 21°C
0 = no changeover
1 = changeover allowed*
5°C
5 to 16°C
0 = switch off
0 or 1 = operate 20% on
0 = no change
1 = restore factory settings
* To change from Heating to Cooling Mode, press and
hold both  and
buttons together for 3 seconds
Relay Box button
2a.
2b.
C0
2c.
2d.
CL
C0
Red light
turns Off
25.
c
0
WEEE Directive 2012/19/EU
At the end of the product life dispose
of the packaging and product in a
corresponding recycling centre.
Do not dispose of the unit with the usual
domestic refuse. Do not burn the product.
Installation Guide
for 340009 (EHE0200364) RF Thermostat
Introduction
340009 is an RF thermostat. The Room Unit
communicates with the relay Box on an 868MHz
Radio Frequency (RF) to control a single heating
system component such as a boiler, pump or zone
valve. Neither product will communicate with
other RF products that use different frequencies or
communication protocols.
Note: The RF link between the Room Unit and
Relay Box is pre-configured at the factory so
these units should be installed together at the
same site. If the units become separated or one of
them needs replaced, they will need to be bound
together – see Binding or Re-Binding Procedure.
Specification
Power Supply: 230Vac, 50–60 Hz (Relay Box)
2 x AA Alkaline batteries (Room Unit)
Switch Rating: SPDT, 24 to 230Vac, 50–60 Hz, 5(3)A
Installing the Relay Box
1
2
The Relay Box is a RF device. For
the best performance install in an
open space. Leave at least 30cm
distance from any metal objects
including wall boxes and boiler
NOTE: The Relay Box contains no
housing.
user serviceable parts. It should
Do not mount on metal wall
be opened and installed by a
boxes.
qualified installer only.
EMC compliance considerations
WARNING: Electrostatic sensitive
device! Do not touch the circuit
Keep AC mains supply/load cables
board.
separate from signal wiring.
Hereby, Wolseley declares that this thermostat complies with the
essential requirements and other relevant provisions of Directive
R.E.D.: 2014/53/EU. Receiver Category 2. Max RF power: 25mW.
Operating frequency: 868.3MHz (868.0 to 868.6MHz).
The full text of the EU Declaration of Conformity is available at
the following Internet addresses:
www.wolseley.co.uk
www.plumbcenter.co.uk
www.partscenter.co.uk
www.climatecenter.co.uk
3
=
3.5
M
=
N
o
6
< 7mm Ø
b.
> 7mm Ø
32331221-001 B

Advertisement

loading

Summary of Contents for Center EHE0200364

  • Page 1 WARNING: Electrostatic sensitive > 7mm Ø the printing process and are NOT to be used for matching purposes. E&OE. Wolseley UK, The Wolseley Center, Harrison Way, Spa Park, device! Do not touch the circuit Keep AC mains supply/load cables Royal Leamington Spa, CV31 3HH board.
  • Page 2 Testing the RF Signal Strength Burner (direct control) Combi boiler While still in TEST mode: A-B:5(3)A A-B:5(3)A A-C:5(3)A A-C:5(3)A Check 24 to a. Press and hold the button to enter wireless 230Vac 230Vac 230Vac 230Vac signal 50–60Hz 50–60Hz SIGNAL STRENGTH Mode Press 50–60Hz 50–60Hz...

This manual is also suitable for:

340009