Orifice Block Assembly - GE Becker VRP-B-CH Series Instruction Manual

Valve regulator pilots
Table of Contents

Advertisement

Orifice Block Assembly

1. Place O-ring -011 (N1) in the adjusting orifice (K1). Place the
assembly in the orifice manifold (K) as shown.
2. Place O-ring -011 (N1) in the nuts (M1) and secure the adjusting
orifice (K1) with nuts (M1) in the orifice manifold (K) as shown
K1
17 | GE Oil & Gas
J
K
M1
N1
K
3. Seat the four -012 O-rings (L) into the inlet and exhaust port
recesses on the pilot body block (F). (Note the orientation of the
body in relation to the orifice block).
3a. Attach the orifice block (K) to the pilot body block (F) with
two 1/4– 20 x 2-1/2-in stainless steel HHCS (J) by lining it
up with roll pins (M) in pilot body block (F).
F
M
L
N
© 2016 General Electric Company. All rights reserved.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents