Riello Gulliver BS1 Installation, Use And Maintenance Instructions page 39

Forced draught gas burners
Table of Contents

Advertisement

Available languages

Available languages

INDEX
1.
BURNER DESCRIPTION . . . . . . . . . . . . . 1
1.1 Burner equipment. . . . . . . . . . . . . . . . . . . 1
2.
TECHNICAL DATA . . . . . . . . . . . . . . . . . 2
2.1 Technical data . . . . . . . . . . . . . . . . . . . . . 2
2.2 Overall dimensions. . . . . . . . . . . . . . . . . . 2
2.3 Firing rates. . . . . . . . . . . . . . . . . . . . . . . . 3
3.
INSTALLATION . . . . . . . . . . . . . . . . . . . . 4
3.1 Working position . . . . . . . . . . . . . . . . . . . 4
3.2 Boiler fixing . . . . . . . . . . . . . . . . . . . . . . . 5
3.3 Probe-electrode positioning . . . . . . . . . . . 5
3.4 Gas train . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.5 Gas train electricity supply . . . . . . . . . . . . 6
1.
BURNER DESCRIPTION
One stage gas burner.
The burner meets protection level of IP 40, EN 60529.
CE marking according to Gas Appliance directive 90/396/EEC; PIN 0085AQ0409.
According to directives: EMC 89/336/EEC, Low Voltage 73/23/EEC, Machines 98/37/EEC and
Efficiency 92/42/EEC.
Gas train according to EN 676.
1 – Air pressure switch
2 – 6 pole socket for gas train
3 – Control box with 7 pole socket
4 – Reset button with lock-out
lamp
5 – Flange with insulating gasket
6 – Air damper adjustment
assembly
7 – Head holder assembly
8 – Pressure test point
1.1 BURNER EQUIPMENT
Flange with insulating gasket . . . . . . . No. 1
Screw and nut for flange . . . . . . . . . . No. 1
Capacitor . . . . . . . . . . . . . . . . . . . . . . No. 1
2146
3.6 Gas feeding line . . . . . . . . . . . . . . . . . . .
3.7 Electrical wiring . . . . . . . . . . . . . . . . . . . .
4.
WORKING . . . . . . . . . . . . . . . . . . . . . . .
4.1 Combustion adjustment. . . . . . . . . . . . . .
4.2 Combustion head setting. . . . . . . . . . . . .
4.3 Air damper setting . . . . . . . . . . . . . . . . . .
4.4 Combustion check. . . . . . . . . . . . . . . . . .
4.5 Air pressure switch . . . . . . . . . . . . . . . . .
4.6 Burner start-up cycle . . . . . . . . . . . . . . . . 10
5.
MAINTENANCE . . . . . . . . . . . . . . . . . . . 10
6.
FAULTS / SOLUTIONS. . . . . . . . . . . . . . 10
Fig. 1
Screws and nuts for flange to be fixed to boiler . . No. 4
7 pin plug . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No. 1
1
GB
6
7
8
8
8
9
9
9
S7761

Advertisement

Table of Contents
loading

Table of Contents