Startup

Pre-Startup Checklist

Once the M-Series Climate Changer air handler has been assembled and installed, attention must
be directed to individual components for proper operation. Before operating the unit, complete the
pre-startup checklist.
Hazardous Voltage with Capacitors!
Disconnect all electric power, including remote disconnects before servicing. Follow proper
lockout/tagout procedures to ensure the power cannot be inadvertently energized. For variable
frequency drives or other energy storing components provided by Trane or others, refer to the
appropriate manufacturer's literature for allowable waiting periods for discharge of capacitors.
Verify with an appropriate voltmeter that all capacitors have discharged. Failure to disconnect
power and discharge capacitors before servicing could result in death or serious injury.
Note: For additional information regarding the safe discharge of capacitors, see

General Checks

Note: UL-listed units require a removable latch on access doors. The door clip shipped with the
CLCH-SVX03C-EN
WARNING
PROD-SVB06A-EN or PROD-SVB06A-FR
Ensure the unit has been installed level.
Ensure supply-air and return-air ducts have been connected.
Ensure damper operator motors and connecting linkage have been installed.
Verify damper operation and linkage alignment.
Check that air filters are in place and positioned properly.
Remove any debris from the unit interior.
Remove all foreign material from the drain pan and check drain pan opening and condensate
line for obstructions.
Close and secure all unit access doors.
unit meets this requirement.
If differential pressure switch is provided on filter rack, adjust per system requirements.
Inspect electrical connections to the unit and unit controllers.
– Connections should be clean and secure.
– Compare the actual wiring with the unit diagrams.
– Reference the appropriate controller manual for more details about starting units with
factory-mounted controls.
– Check piping and valves for leaks. Open or close the valves to check for proper operation.
Drain lines should be open.
Leave this manual with the unit.