Bryant 549J Series Installation Instructions Manual page 21

Single package rooftop heat pump with puron (r-410a) refrigerant
Table of Contents

Advertisement

Low Voltage Control Connections
Run the low-voltage control leads from the heater module(s) —
VIO and BRN (two of each if two modules are installed; identify
for Module #1) — to the 4-pole terminal board TB4 located on the
heater bulkhead to the left of Heater #1. Connect the VIO leads
from Heater #1 and Heater #2 to terminal TB4-1. Connect the
BRN leads to terminal TB4-3. See Fig. 35.
DEFROST
BOARD
E-HEAT
ORN
P3-3
BRN
ORN
1
TB4
VIO
Field
Connections
HR1: On Heater 1 in Position #1
HR2: On Heater 2 in Position #2 (if installed)
Fig. 35 — Accessory Electric Heater Control Connections
BRN
3
VIO
BRN BRN
Elec Htr
VIO
HR2
BRN
VIO
HR1
BRN
CONTROL AND POWER WIRING DIAGRAMS
Figures 36-42 are typical control and power wiring diagrams.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

549j-q4a549j-05a549j-06a

Table of Contents