4.1 ASSEMBLY PROCEDURE

A) Position the wall fixing bracket on the
wall where the indoor unit is to be installed.
Make sure the bracket is with a level
perfectly horizontal and that the support surface
is regular.
Use the bracket as a template and mark the position
of the holes to be made.
B) Once the position of the fasteners is
marked,make appropriate holes for the insertion of
wall plugs to choose based on the weight of the unit
internal in operation and the structural type of the
wall.
C) Insert the fixing bracket again and tighten
with the wall screws, chosen on the basis of the
indications
reported in point B.
D) Hang the indoor bracket unit just
fixed to the wall without cover cabinet using
the slots on the lower part of the bracket.
E) Once the indoor unit has been hung to the
bracket
of
wall
connection of the sanitary circuit 1/2
F) Proceed with the connection of the delivery and
of the heating system return using 3/4 "fittings
WARNING!
the
machine is able to supply the water flow nominal
with the prevalence indicated in the table of
technical data. Check that your losses load do
not
exceed
the
However, it is recommended to comply with the
requirements below:
- the diameter of the pipe of the sampling line from
the network should never be less than that machine
attack;
- adequately fix the pipes, whose weight it must not
weigh on the appliance;
- properly insulate the pipes to prevent heat losses.
14
mounting
proceed
ENTRY
WATER
RETURN
PLANT
circulator
mounted
prevalence
useful
with
the
FLOW
DHW
DELIVERY
PLANT
on
board
available.