1
Parts Identifi cation
Stack matching pieces in piles. Using the parts list, locate
and count the individual pieces and verify that you have
received the correct number of pieces.
If any pieces are missing or replacement parts are required, contact
Gronomics at 1-855-299-6727.
NOTE: Ground preparation is optional, however we
recommend leveling area under frame of product, or place
product directly on a flat level surface before filling with
soil.
ITEM
QTY.
1
2
2
1
3
1
Product Care and Maintenance
outdoors, a natural oil finish applied regularly will help maintain the beauty and minimize cracking and drying. It is recommended to use Gronomics Garden Bed
Oil (Item # GBO-1Q), a non-toxic, food safe finish that is very easy to apply.Apply Oil when air and wind temperatures are between 50-90degrees. Avoid applying
in direct sunlight .
2
Post Assembly
Remove one 4" x 4" x 13" post by lifting straight
upward and removing from the garden bed.
Install a 4" x 4" x 80" trellis post (Item 1). Align the
trellis post slots with the side rails and lower trellis
post fully to the ground.
Repeat this procedure for the second trellis post.
Packaged & Inspected by:
www.gronomics.com
Parts List
PART #
DESCRIPTION
M8000
Trellis Post, 4" x 4" x 80"
R4500L
Side Rail, w/Logo Notched Board, 45" x 5-1/2" x 7/8"
4880
Trellis Net 48" x 80"
- Western Red Cedar will turn a weathered grey if left unfinished. Although no finish is required for cedar when used
Modular Trellis Kit
(48" x 80" H) Assembly Instruction
1
Remove Posts And Install 4" x 4" x 80" Trellis Posts
Logo
East Bethel, MN USA
Item #: MTK 48-80
2
Date:
3
1
Side
Side
Rails
Rails
Continued
763-753-7374
Need help?
Do you have a question about the MTK 48-80 and is the answer not in the manual?
Questions and answers