Page 1
31” x 2½” x 1” Narrow Support Rail 3103 Packaged & Inspected by:_______________________ Date____________________ NOTE: If you need assistance with parts or have assembly questions, please contact Customer Service either via email at info@gronomics.com or phone at 763-753-7374. 31-Oct-12 AssemblyInstructionSheet...
Page 2
® GRONOMICS “TOOL FREE ASSEMBLY” STEP II (Figure 1) A) Start with two 4” x 4” x 13” corner posts and one 4” x 4” x 13” center post, place the posts upside down. B) Slide both 45” x 5½” x 1” side rail w/logo upside down between each post.
Page 3
Packaged & Inspected by:___________________________________ Date____________________ NOTE: If you need assistance with parts or have assembly questions, please contact Customer Service either via email at info@gronomics.com or phone at 763-753-7374. STEP II A) Slide the right and left trellis posts into the Raised Garden Bed frame.
Page 4
® GRONOMICS “TOOL FREE ASSEMBLY” 95 x 80 Raised Garden Bed Trellis Net Assembly Instructions STEP II igure 1) A) Weave the two 45” x 5½” x 1” side rail through the trellis net, with the double strand of netting on the top.
Need help?
Do you have a question about the RGB 34-95 and is the answer not in the manual?
Questions and answers