Retrofit Meter Installation - Neptune Technology ProCoder R900i Installation And Maintenance Manual

An integrated meter-reading register
Table of Contents

Advertisement

Use caution; the meter threads are sharp.
4. Place the coupling gaskets inside the coupling nuts and set the meter in the line.
Align the meter in a horizontal position with the register dial facing upward. The
direction of flow marked on the meter must agree with the direction of actual water
flow.
5. Tighten the coupling nuts by hand then use a wrench and tighten sufficiently to
prevent leakage. Be careful not to cross-thread the connections.
6. Open the meter outlet valve slowly. Open a downstream faucet and run enough
water to dissipate entrained air and flush the line. While the faucet is open, verify the
meter is operating correctly.
7. Turn off the faucet and check the meter installation for leaks. See "Reading
the ProCoder™)R900i™" on page 7

Retrofit Meter Installation

1. Use a punch / screwdriver and hammer to punch out the
tamper-proof seal pin on the existing register head.
2. Remove the existing register by twisting counter-clockwise.
3. Install the new ProCoder)R900i register head onto the meter body in the desired
orientation by twisting clockwise.
4. Snap the new tamper-proof seal pin to secure the register to the meter body.
ProCoder™)R900
™ Installation and Maintenance Guide
i
Chapter 4: Installing the ProCoder™)R900i™
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents