Wiring Work(Continued)
AMFNFDEH Series
1
Before wiring work, you must turn off all power source.
2
Indoor unit power should be supplied through the breaker
( ELCB or MCCB+ELB ) separated by the outdoor power.
ELCB: Earth Leakage Circuit Breaker
MCCB: Molded Case Circuit Breaker
ELB: Earth Leakage Breaker
3
The power cable should be used only copper wires.
4
Connect the power cable{1(L), 2(N)} among the units within maximum
length and communication cable(F1, F2) each.
5
Connect F3, F4(for communication) when installing the wired remote
control.
Outdoor Unit
220-240V~
or
MCCB+
ELCB
ELB
Indoor Unit 1
ELCB : Essential Installation
WARNING :
Power off before connecting any wires;
Indoor PBA will be damaged while V1,V2,F3,F4 short each other.
Connecting power for optional product
When installing optional product, make sure to follow below current capacity.
Optional product is not supplied by manufacturer.
POWER : L
POWER : N
OPTION
VENTILATOR
AC, Below 2A
NASA_Floor Stand_AM@@@FNFDEH@_IM_EN_03678A-05.indd 13
Indoor Unit 2
Indoor Unit 3
T/B
1(L)
2(N)
Vc
Vc
AC, Below 2A
Wired Remote
Control
Vw
Vw
HOT
COIL
13
E-
2016-05-09 오후 5:32:31