Samsung AM JXVAF Series Installation Manual page 72

Table of Contents

Advertisement

Pipe insulation
Insulate the distribution header
Fix the distribution header with a cable tie and cover the connected part.
Insulate the distribution header and the welded part and wrap the connected part with an
adhesive insulation tape to prevent dew formation.
Adhesive insulation tape
Insulate the refrigerant
Insulate the
pipe
distribution
header
Fix the distribution header with a hanger after insulating it.
Insulating the branch joint
Tightly attach the insulator, provided with the branch joint, to the separately purchased insulator. Wrap the connected
part with an insulator (separately purchased item) that has thickness of at least 10mm (0.39 inch).
Use an insulator that resist heat up to 120°C. Wrap the branch joint with an insulation that has thickness of at least 10mm
(0.39 inch).
Pipe insulator
(Separately
purchased item)
Fix securely without
any gap.
150mm
Branch
(5.90 inch)
joint
Thickness of the insulator (Separately purchased item) should be
thicker than 10mm (0.39 inch).
72
Provided
Insulator
Fix securely without any gap.
Adhesive insulation tape
Insulation tape (Separately purchased item)
Pipe
Pipe insulator (Separately purchased item)
Pipe insulator
(Separately
❋ Attach the adhesive insulation tape to the
purchased item)
Insulate after welding a stopper
pipe, as shown in the picture, after insulating
the pipe.
Insulation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am jxvaj seriesAm080jxvafh/azAm100jxvafh/azAm120jxvafh/azAm140jxvafh/azAm160jxvafh/az ... Show all

Table of Contents