Function Tests - Genie Z-45/25 Bi-Energy Operators Manual With Maintenance Information

Hide thumbs Also See for Z-45/25 Bi-Energy:
Table of Contents

Advertisement

Operator's Manual

Function Tests

Do Not Operate Unless:
You learn and practice the principles of safe
machine operation contained in this operator's
manual.
1 Avoid hazardous situations.
2 Always perform a pre-operation
inspection.
3 Always perform function tests prior to
use.
Know and understand the function tests
before going on to the next section.
4 Inspect the workplace.
5 Only use the machine as it was intended.
16
Genie Z-45/25 Bi-Energy & Genie Z-45/25J Bi-Energy
Second Edition • Second Printing
Fundamentals
The function tests are designed to discover any
malfunctions before the machine is put into
service. The operator must follow the step-by-step
instructions to test all machine functions.
A malfunctioning machine must never be used. If
malfunctions are discovered, the machine must be
tagged and removed from service. Repairs to the
machine may only be made by a qualified service
technician, according to the manufacturer's
specifications.
After repairs are completed, the operator must
perform a pre-operation inspection and function
tests again before putting the machine into service.
Part No. 82596

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z45/25j

Table of Contents