Download Print this page

Bang & Olufsen BeoCenter 2 Manual page 9

Socket unit
Hide thumbs Also See for BeoCenter 2:

Advertisement

A
Horizontal position: One screw must be a lag
screw (4 mm – countersunk/#8 – 5/32"), which
penetrates the gypsum, and is screwed a
minimum of 15 mm (5/8") into a vertical stud.
Furthermore, for stability, at least one screw of a
type intended for gypsum panels, must be used in
one of the other holes.
A
Vertical position: Use two lag screws (4 mm –
countersunk/#8 – 5/32"), which penetrate the
gypsum, and are screwed a minimum of 15 mm
(5/8") into a vertical stud.
Removing the Socket unit from the wall
bracket:
To ensure that the Socket unit is placed securely
on the wall bracket, the wall bracket has two lock
mechanisms (A) which must be released before
the unit can be removed.
Push the two clips in towards the wall and lift the
2
unit out of the bracket.
1
Special notice about light partition walls
If you intend to hang the BeoCenter 2 Socket unit
on a gypsum wall (also known as drywall or wall-
board), the wall bracket must be fastened to a
vertical stud.
9

Hide quick links:

Advertisement

loading