Introduction - ABB MR Series Startup Procedure

Ft-spectroradiometers
Table of Contents

Advertisement

1. INTRODUCTION

This section is intended for users who have not received the operation training but want to get the instrument up
and running. It also contains useful reference information on the set-up of the instrument (hardware and
software) and on packing the instrument in order to ship it.
This section also contains information on the handling of hygroscopic materials and should be studied by
customers having ordered optional hygroscopic optics for their MR system.
Start-Up Procedure
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mr100Mr200Mr100 dsp

Table of Contents