ABB MR Series Startup Procedure page 19

Ft-spectroradiometers
Table of Contents

Advertisement

12. Watch the status indicated on the connector plate of the spectroradiometer and check that the correct LED
sequence is followed.
13. Start the acquisition software from the computer (please refer to the next section or the software manual)
and go into the alignment/status screen where the interferogram and spectral data are displayed in real time.
14. At this point, the system is operational and data can be acquired.
Start-Up Procedure
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mr100Mr200Mr100 dsp

Table of Contents