Power Transformer Unit Installation; Installation; Preinstallation Inspection; Sdcp Ribbon Cable Installation - Paradyne COMSPHERE 3000 Series Installation Manual

Carrier
Hide thumbs Also See for COMSPHERE 3000 Series:
Table of Contents

Advertisement

COMSPHERE 3000 Series Carrier
Power Transformer Unit

Installation

The carrier derives its low voltage ac power from the
power transformer unit mounted at the bottom of the
carrier.

Preinstallation Inspection

Check the unit for physical damage. Ensure that the
unit has not been damaged, possibly causing a short
circuit of internal components. If the power transformer
unit shows signs of shipping damage, report this
immediately to your shipping representative and also to
your AT&T Paradyne representative. Otherwise, tighten
any screws that may have worked loose with a
screwdriver and proceed with the installation.
If an SDCP is to be installed in the carrier, inspect the
SDCP and its cable at this time, as well, and report any
damage.
3-10
Figure 3-6. Power Transformer Unit Installation
December 1994
Installation
If installing an SDCP in the carrier, the ribbon cable
that provides power to the SDCP must be installed before
the power transformer unit is installed.

SDCP Ribbon Cable Installation

.
To install the SDCP ribbon cable:
Procedure
1. Decide on the most convenient height for the
SDCP. This is usually at eye level (probably the
second or third carrier from the top of the cabinet).
2. Remove the cover plate from the selected carrier
by unscrewing the four captive screws
(Figure 3-1).
3. At the front of the carrier (Figure 3-6), slide the
fan module straight out and set it aside.
3000-A2-GA31-80

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents