Download Print this page

Cooper Neo-Ray Define S122 IP Installation Instructions page 3

Advertisement

Installation Instructions – Define S122-125 Suspended LED Luminaire
Remove knockout from access plate andattach strain relief to SJ
Cord .Pull SJ cord through access plate to lock SJ cord in place
on access plate.
Remove non-wiring access plates from both fixtures prior to
joining by removing two #8-32 screws. (Fixture information
and UL labels should be visible on both sides of the non-wiring
access plates
FOR CONTINUOUS ROWS ONLY: Hang far end of the next
fixture in the row using the griplock
cable. Temporarily rest adjoining fixture on the first and join
dimming and power wires using the provided push nuts.
3
5
7
and pre-installed aircraft
®
Installation Instructions – Define S122-125 IP
IL524026EN
Connect power and dimming leads to SJ cord as required
using wire nuts (by others) Once power and dimming wires are
connected, push the wiring back into the fixture and re-attach
the access plate.
Alignment Pins
FOR CONTINUOUS ROWS ONLY: Hang far end of the next
fixture in the row using the griplock
cable. Temporarily support the other end. Ensure the alignment
pins and cast joiners are seated correctly in the adjoining fixture
Slide fixtures together ensuring that both fixtures are level and
properly aligned.
www.cooperlighting.com
4
Wire Nut (by others)
6
Cast Joiner
and pre-installed aircraft
®
8

Advertisement

loading
Need help?

Need help?

Do you have a question about the Neo-Ray Define S122 IP and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Neo-ray define s125 ip