Installation Of The Joint - ABB WavePro LT Installation And Maintenance Manual

Aluminium busway
Table of Contents

Advertisement

WavePro LT Aluminium Busway Installation and Maintenance Manual
Installation

Installation of the joint

If the installation work interrupted, all the joint and busway ends should be covered by plastic to prevent it form water or
dust.
Notice: Don't use extreme force when inserting the joint. Please use a wood or rubber mallet to hit it when needed. Never use a
steel hammer or other hard object to assist the installation.
Fig. 2.11
Fig. 2.12
Fig. 2.13
15

Advertisement

Table of Contents
loading

Table of Contents