FINISHING COMMISSIONING

The boiler has been factory set, so there
should be no need to adjust any controls.
REPLACE OUTER CASING:
1 Replace outer casing making sure that the
securing points are properly located.
Replace top two screws (A).
Retighten bottom two screws (B).
INSTALLING BOTTOM PANEL:
2 The bottom panel slides onto two ledges
(C) either side of the boiler frame.
Hold the panel up against the underside of
the boiler and slide towards the rear until it
is fully engaged.
HANDOVER:
Complete the Benchmark checklist.
NOTE: The Benchmark Checklist can be
found at the rear of these instructions.
Open the facia cover by gently pressing the
centre top of the cover (D).
Set up the controls and show the user how
to operate all the controls shown in the User
Guide.
Place the user guide into the tray (E) on the
inside of the facia cover.
If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler.