Installation Procedure - YASKAWA SI-N3 Installation Manual

Ac drive-option card devicenet
Hide thumbs Also See for SI-N3:
Table of Contents

Advertisement

5 Installation Procedure

5
Installation Procedure
Section Safety
Power to the drive must be shut off when installing the DeviceNet Option.
Even though the power has been shut off, voltage still remains in the drive's DC bus. Wait
before removing the front cover once the drive has been turned off.
The CHARGE light on the drive will go out after voltage in the DC bus drops below 50 V,
at which point it is safe to remove the front cover.
Due to the risk of electric shock, be sure that all LEDs have gone out and that the DC bus
voltage has reached a safe level prior to performing any work on the drive.
Do not remove the front cover of the drive while the power is on.
Failure to comply could result in death or serious injury.
The diagrams in this section may include option cards and drives without covers or safety
shields to show details. Be sure to reinstall covers or shields before operating any devices.
The option should be used according to the instructions described in this manual.
Do not allow unqualified personnel to use equipment.
Failure to comply could result in death or serious injury.
Maintenance, inspection, and replacement of parts must be performed only by authorized
personnel familiar with installation, adjustment, and maintenance of this product.
14
YASKAWA ELECTRIC TOBP C730600 43A YASKAWA AC Drive-Option Card DeviceNet Installation Manual
DANGER
Electrical Shock Hazard
W ARNING
Electrical Shock Hazard

Advertisement

Table of Contents
loading

Table of Contents