DURKOPP ADLER D867 Additional Instructions page 14

Neat seam beginning (nsb)
Table of Contents

Advertisement

Fig. 10: Assembling the NSB into the machine (5)
(6) - Compressed air maintenance unit
(7) - Connection hose
21. Assemble the compressed air maintenance unit (6) to the stand (if not
22. Connect the air hose (8).
23. Connect the connection hose (7) to the compressed air supply.
Fig. 11: Assembling the NSB into the machine (6)
(9) - Suction hose
(10) - Pneumatic hose
24. Assemble the suction container (11) under the tabletop.
25. Assemble the suction hose (9) to the suction container (11) using
26. Connect the pneumatic hose (10) to the suction container (11).
27. Lay the suction hose (9) and the pneumatic hose (10) through the slot
12
yet present).
the clip.
in the oil pan under the machine.
Assembling the neat seam beginning (NSB)
(8) - Air hose
(11) - Suction container
Additional Instructions M-TYPE DELTA - 00.0 - 05/2020

Advertisement

Table of Contents
loading

Table of Contents