Step 32
Install 1x6 Fascia Boards on Lower Soffit
1. Install a 73" long 1x6 fascia board over
the front soffit box. Install 1x6 against
the bottom of the roof sheathing, flush
with the siding on the roof gables.
Use 8d galvanized box nails spaced to
catch the 2x4 blocks behind.
2. Install (2) two more 1x6-73" fascia
boards.
3. Repeat to install fascia on the back
soffit boxes.
Install Roof Covering and Dormer Flashing - Owner Supplied
If you purchased our optional pre-cut metal roof package, follow the instructions
included with that kit for the rest of the construction process. If you purchased a
different metal roof system, follow the manufacture's installation instructions and
special assembly instructions as noted in the following steps.
IMPORTANT: Flashing must be installed before applying the dormer siding. Apply
flashing prior to installing shingles, or after metal roof panels are installed.
1. Install roof paper over the roof
sheathing. Fold the roof covering so
it also cover the sheathing on the
dormer front and sides.
2. Install (2) two 78" long pieces of metal
flashing over the dormer. Extend the
flashing 2" beyond the front sheathing.
Cut the flashing to extend around the
dormer. Tack in place across the top
using 6d common nails.
3. Install flashing on the back dormer.
1x6 - 73" Fascia
.
.
.
.
.
.