Download Print this page

Sentry Lakewood Assembly Book page 10

Advertisement

Step 4
Assemble 140-1/2" Long Back Wall
1. Cut (1) one treated 2x4-12' and (1) one untreated 2x4-12' to a length of 140-1/2". Position
the boards together and indicate with 'X' marks, where the wall studs will be located.
Untreated Top Plate
Treated Bottom Plate
140-1/2" Untreated Plate
2. Install pre-cut wall studs between the top and bottom plates using 16d galvanized nails for
the treated bottom plate and 16d coated sinker nails for the top plate. Mark this panel as 'BL'.
3. Square the wall frame. Install the first siding panel with the 'LAP edge' extending 3-1/2"
beyond the end of the wall. Secure using 8d galvanized box nails spaced 8" apart.
4. Install (2) two more siding panels.
LAP Edge
Siding Extends 3-1/2"
Beyond 2x4 Frame
140-1/2" Wall Plate
X
X
X
X
19-3/4"
24"
:
:
:
X
X
X
X
24"
:
:
:
140-1/2" Treated Plate
Install siding flush for concrete slab
or 3/4" below plate for wood floor.
:

Advertisement

loading