Install Insulation Bottom Rail Support - Hussmann EcoVision EZ Door Upgrade Installation & Operation Manual

For impact medium temperature merchandisers
Table of Contents

Advertisement

EcoVision EZ Door Upgrade
Install insulation and inner bottom rail
5
supports.
A. Clean sealers and (or) Perma-gum off
front supports before attaching insulation
or bottom rail support
B. Insert insulation with notched side toward
the outside of the case (3) per 12 ft case,
(2) per 8 ft case as shown in Figure 5-1
and 5-2.
C. Install inner bottom rail support and
attach it to the front supports using #8 x
3
/
in. screws.
8
6
Attach the outer bottom rail support
to the front of the case with #8-18 x
1
/
in. screws.
2
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
P/N 558756_C
5

Advertisement

Table of Contents
loading

Table of Contents