Installation Requirements; Parts That Come With The Pdu - IBM DPI C13 PDU+ Installation And Maintenance Manual

Table of Contents

Advertisement

Installation requirements

You will need the following tools to install the PDU in a rack cabinet:
v One Phillips screwdriver
v One 10 mm (11/32-in.) wrench
v One cage-nut-insertion tool or flat-blade screwdriver (for installing cage nuts in
You can install a PDU vertically in the side of a rack cabinet or horizontally within 1
U
v For horizontal mounting instructions, see the rack-mounting document that comes
v For vertical mounting instructions, see Chapter 2, "Installing the PDU vertically in

Parts that come with the PDU

Note: The illustrations in this document might differ slightly from your hardware.
The following parts come with the PDU:
v One PDU (some models include detached line cords)
v Two vertical-mounting brackets (for all rack cabinets)
1. One U is equal to 4.45 cm (1.75 in.)
some rack cabinets)
1
of EIA mounting space in a rack cabinet.
with the PDU.
Attention:
Horizontal installation of the PDU is not supported during relocation
or shipping of a rack cabinet. Before you relocate the rack cabinet, you must
remove any horizontally mounted PDU from the EIA mounting space.
a rack cabinet," on page 9
3
Chapter 1. Introduction

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dpi c19 pdu+Dpi c19 3-phase pdu+

Table of Contents