Huawei TP3206 Installation Manual page 26

Telepresence
Hide thumbs Also See for TP3206:
Table of Contents

Advertisement

HUAWEI TP3206&TP3218&TP3218S Telepresence
Installation Guide
No.
3
4
If the inspected items meet all criteria in
outer package is damaged or soaked, or the equipment has got wet and there is evidence of
corrosion, stop unpacking and find the cause. Report the issue to the local Huawei
representative office.
Unpacking Wooden Cases
Wooden cases are generally used to pack heavy objects such as cabinets, batteries. A wooden
case is composed of wooden boards, steel edges, tongues and foamed wrap angles.
To unpack a wooden case:
1.
Issue 05 (2014-08-01)
Inspection Item
The destination is the installation site.
The total number of goods is consistent with the packing list attached to
the packing case.
Do not put the wooden case upside down. Otherwise, the equipment will suffer severe
damage.
It is suggested to move the wooden cases into the equipment room before unpacking (if
space permits). In doing so, you may avoid damage to the cabinet during the
transportation.
When moving the cabinet, grip the solid parts such as the support or backbone frames. Too
much force on weaker parts of the structure, such as cable supports, may cause damage or
lead to accidents.
Insert one end of the adjustable wrench into the hole of the tongue on the cover of the
wooden case. Lift the adjustable wrench to straighten the tongue, as shown in
Alternatively, use a screwdriver or a hammer to straighten the tongue.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Table
4-12, unpack the cartons for acceptance. If the
4 Preparing for Installation
Figure
4-2.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tp3218Tp3218s

Table of Contents