Electrical Checks - High Voltage Power Circuits - Daikin ComfortNet DX16TC Series Service Instructions Manual

Condensing units, split system heat pumps with r-410a refrigerant blowers, coils, & accessories
Hide thumbs Also See for ComfortNet DX16TC Series:
Table of Contents

Advertisement

SERVICING
Emerson UltraCheck-EZ™ Diagnostic Tool
The Emerson UltraCheck-EZTM diaganostic tool may be used
to diagnose the ECM motor.
HIGH VOLTAGE!
Disconnect ALL power before servicing
or installing. Multiple power sources
may be present. Failure to do so may
cause property damage, personal injury
or death.
To use the diagnostic tool, perform the following steps:
1. Disconnect power to the air handler.
2. Disconnect the 4-circuit control harness from the motor.
3. Plug the 4-circuit connector from the diagnostic tool into
the motor control connector.
4. Connect one alligator clip from the diagnostic tool to a
ground source.
5. Connect the other alligator clip to a 24VAC source.
NOTE: The alligator clips are NOT polarized.
NOTE: The UltraCheck-EZTM diagnostic tool is equipped with
a nonreplaceable fuse. Connecting the tool to a source
other than 24VAC could damage the tool and cause the
fuse to open. Doing so will render the diagnostic tool
inoperable.
6. Turn on power to air handler or modular blower.
WARNING
Line Voltage now present.
7. Depress the orange power button on the diagnostic tool to
send a run signal to the motor. Allow up to 5 seconds for
the motor to start.
NOTE: If the orange power button does not illuminate when
depressed, the tool either has an open fuse or is not prop-
erly connected to a 24VAC source.
8. The green LED on the diagnostic tool will blink indicating
communications between the tool and motor. See table
below for indications of tool indicators and motor actions.
Replace or repair as needed.
Power
Green
Button
LED
OFF
OFF
ON
Blinking
ON
OFF
ON
Blinking
ON
OFF
9.
Depress the orange power button to turn off motor.
10.
Disconnect power. Disconnect diagnostic tool.
11.
Reconnect the 4-wire harness from control board to
motor.

Electrical Checks - High Voltage Power Circuits

HIGH VOLTAGE!
Disconnect ALL power before servicing
or installing. Multiple power sources
may be present. Failure to do so may
cause property damage, personal injury
or death.
1. Disconnect power to air handler or modular blower.
2. Disconnect the 5-circuit power connector to the ECM
motor.
3. Turn on power to air handler or modular.
WARNING
Line Voltage now present.
4. Measure voltage between pins 4 and 5 on the 5-circuit
connector. Measured voltage should be the same as the
supply voltage to the air handler or modular.
71
Motor
Indication(s)
Action
Confirm 24VAC to
TM
UltraCheck-EZ
Not
If 24VAC is confirmed,
Rotating
diagnostic tool is
inoperable.
Motor and control/end
Rotating
bell are functioning
properly.
Replace motor
Rotating
control/end bell.
Not
Check motor (see
Rotating
Motor Check s below).
Replace motor
Not
control/end bell; verify
Rotating
motor (see Motor
Check s below).
tool.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents