13 Commissioning Record
Company
Our reference
Client
Plant
Plant address
Installation/connections
Inspection measure
Installation according to instructions
Condensate drainage correctly connected (if necessary)
Electrical connections installed according to instructions
Control cable from COOL DXS to GOLD connected
according to instructions
Rotation direction, cooling compressor checked
Rotation direction condenser, fan checked
22
www.swegon.com
Date
Project/Air handling unit
Type/size
Approved/
Done
GB.COOLDXS.INS.100507
SO No.
Subject No:
Remarks
We reserve the right to alter specifi cations.