Swegon COOL DXS Installation And Maintenance Instructions Manual page 11

Cooling unit sizes 12 - 80
Table of Contents

Advertisement

GB.COOLDXS.INS.100507
Installation of the GOLD air handling unit
Communication cable should be connected to any of the
bus outlets on the control unit of the air handling unit, see
encircled area on drawing.
Use one of the holes in the oblong rubber coated cable
gland, placed on the rear of the connection hood of the
electric cubicle or on the inspection side of the air han-
dling unit, in order to run a cable into control unit, see
drawing.
Move part of the cable gland to the side in order to be
able to pull the communication cable through. Connect
the cable to an optional bus connection on control unit.
Adjust the cable length inside electrical cubicle and fi t the
cable to seat properly in the lead-through. Then refi t the
lead-through to sit correctly.
www.swegon.com
11
We reserve the right to alter specifi cations.

Advertisement

Table of Contents
loading

Table of Contents