4.7 MACHINE PREPARATION

Before the Ultra-Vac® can be used it must be set
up and prepared for operation.
When setting-up, follow this procedure:
1. Clear the area of bystanders, especially
small children.
2. Be sure you select a spot that has
sufficient space to locate the machine and
enough clearance to allow trucks to drive
under the discharge cyclone.
3. Position the machine approximately 12 feet
(4 meters) from the storage facility.
4. Place all other controls in neutral and set
park brake before dismounting.
5. Remove the plug from the receiver tank inlet.
6
Remove the intake nozzle from its storage
position on the frame and install on the end
of the steel flex tube. Secure in position using
the bolts on the coupler.
7
Connect the 12 foot steel flex tube to the
inlet. Tighten the bolts on the coupler to lock
the tube securely in place.
8. Starting Engine:
a. Place all controls (including Clutch) in
their neutral or off position and lock-off
the hydraulic oil supply valve to the
boom-lift cylinder.
b.
Start the engine using the procedure
outlined in the engine manufacturers
handbook. Run the engine at low idle.
c.
Slowly engage the PTO/Clutch control
to the drive system
9. Use the boom lift control to raise the boom out
of the boom saddle. Use the boom rotation
control to swing boom around until it is in a
working position that will allow a truck to drive
under the discharge cyclone.
10. Reverse the above procedure when
finished working and placing into the
storage or transport configuration.
Stay away from overhead electrical wires
to prevent electrocution.
Fig. 4-4 12ft Bin Clearance
Fig. 4-5 Intake Installation
Fig. 4-6 Flex Tube Installation
Fig. 4-7 Positioned

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra-vac 7614dUltra-vac 7816dUltra-vac 8614d

Table of Contents